Pfister GT49CB0C Guia de Instalação Página 4

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 14
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 3
ENGLISH
4DE/B
12
14
15
DRAIN BODY INSTALLATION
FAUCET FUNCTIONS
11
13
11 HOSE CONNECTION
11A11B),
11A). If the
11C) separate slightly but do not pull off receiving Tube
11B), the connection is secure.
11D11E11F ).
11D) all the way up until completely seated. Be careful not
11G).
12 WATER SUPPLY CONNECTIONS
12A12B). Then, insert Inlet
12A12C). Hot water supply lines go into left inlet.
Supply lines not included). Please follow
12D) into
Valve Body Holes12E), to secure unit.
WARNING:12A) once installed!
13 POP-UP INSTALLATION
13A
assembly.
14 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the sink.
15 FAUCET FUNCTION

open-counterclockwise.
Note: see step 16).
A
HOT
HOT
OPEN OPEN
COLD
COLD
13A
11B
11B
11A
11D
11F
11F
11G
11G
11E
11D
11A
11B
11C
11A
12A
12D
12D
12E
12D
12A
12B
12B
12C
12C
Vista de página 3
1 2 3 4 5 6 7 8 9 ... 13 14

Comentários a estes Manuais

Sem comentários